Investment:  The cost of the Army Iron Man campaign is $2,500 for each state in a recruiting battalion.  For example, with a full-price investment, a statewide Army Iron Man campaign for Florida would require an investment of $10,000.  If each battalion of the 2nd Brigade made the full-price investment, the campaign would cost $42,500. 
Battalions share the costs:  With our shared costs plan, the investment drops from $2,500 to $1,650 per battalion.  For example, in Florida, the investment would drop from $10,000 to $6,600 for a statewide campaign, a savings of $3,400.  Under this shared costs plan, TSF Radio Network would manage 17 different Army Iron Man campaigns for the 2nd Brigade at a total cost of $28,050, a total savings of $14,450.  That's each recruiting battalion in a state, sharing the cost of a campaign in that state.  Yet, even though the battalions are sharing the costs, they're still receiving the full benefits of the campaign.
Battalions share the costs, split the remainder with the brigade:  To save even more, we recommend splitting the costs between the battalion and brigade with our cost-splitting plan.  The brigade would pick up $15,755 of the total cost with the battalions sharing the remainder of the costs for the statewide campaigns.  The investments per battalion would range from   $825 - $3,325 per battalion, depending upon the number of states in each battalion.
Investment Options
Full-Price $2,500 x 17 BN $42,500.00
Shared Costs $1,650 x 17 BN $28,050.00
Cost Splitting $14,025.00 $14,025.00
(Average $825.00/BN) (Brigade Investment)

Next Page